Officially Done! Our first vertical rock pillars.
01.06.2010
Check out this sweet install process from shop to finished product. Total time? One hour. We pity the poor car that runs into these suckers, because they were made with zero give in mind. Expect to see more developments with this product soon. Thanks to Nathan Giffin, and the dudes at VerticalArtisans.com
and
Posted under: Blog, vertical concrete
Leave a Reply
You must be logged in to post a comment.